Checking the diagonals to make sure the forms are square
Corner detail at conduit locations
This strap will be connected to the other form (once it's been set in place) to hold the bottom of the forms together
This photo shows the extensive bracing to keep the boards from blowing out under the weight of the concrete. Luckily, the pour is less than 12" deep, so it's nowhere near as much lateral pressure as a full-height basement wall.
No comments:
Post a Comment