I may not be spending as much time working on the house, but at least the contractors have been productive. Tuesday, the mechanical guys installed the water heater that will serve the radiant floor, as well as the associated expansion tank, pressure relief valve, pump, etc. Now I know I'll be warm this winter! I don't dare turn it up very high until my second layer of adobe is good and dry or the place will turn into a crack den.
And today, the electricians battled a VERY reluctant bundle of cables to pull them from the sub panel outside into the house. Lesson learned: two long sweep bends is a tough pull with 2" conduit. Three bends (like my place) is a real chore! It was reminiscent of raising the sails on a Maine Windjammer: one, two, three... PUULLLL! One inch gained. Sometimes two or three. It was a nice payoff, though. On a drizzly, dreary day outside, it was bright and cheery inside for the first time!